SUMMARY OF THE FIFTH NARRATIVE SEMI-ANNUAL REPORT FOR THE PROJECT SUST-MARINA

Project objectives  ̶  Actually, the project objectives in the fifth six-month period of project realization are in relation to implement some directions to confirm that marina has all the capacities and conditions to become environmentally familiar with regards to Improvement of Safety and Services in AD Marina Bar (WP 9). The summary of objectives emphasizes making plans and strategies for satisfying each criterion for Blue Flag programme, certification of ISO 14001:2015 and ISO 9001:2015 (WP 10) and Gold Anchor award for providing green concept in marina.

Work performed  ̶  At the moment, the project activities were directed to the implementation and realization of issues compressed in deliverables and milestones, so in order to that, during fifth six months it was done the following: the received Certificate of the second year pilot programme of Blue Flag from June 2016 to May 2017, established adequate and clearly signposted lifesaving, first-aid and fire-fighting equipment where equipment as approved by national authorities (WP 9), developed of Emergency Plans in case of pollution, fire or other accidents (WP 9), designed and applied of posters on safety precautions and information in the marina (WP 9), prepared on the third publication-brochure in relation to the level of project realization (WP 9), developed of electricity and water outlet installations available at the berths and approval according to national legislation which have been approved (WP 9), designed and implemented of wheelchair access and accessibility features (WP 9), designed and implemented of a clearly posted map indicating the location of different facilities in the marina (WP 9), promoted of book MARINAS (Small Craft Harbour – Sustainable Development) which has been written through SUST-MARINA project regarding development of detail emergency plan in marina (WP 9), integrated of marina EMS with emergency plan in marina (WP 9), implemented all documentations for Integrated Management System (ISO 9001:2015 and ISO 14001:2015 standards) of AD Marina Bar which have been already prepared (WP 10), assessment and review of all objectives achieved during implementation of Integrated managament system (QMS (2015) and EMS (2015)) (WP 10) and assessment of expected results obtained during implementation of documents and procedures of (QMS and EMS (2015)) to AD Marina Bar – 15 Procedures and Guide Manual – Handbook (WP 10).

The main result achieved in the fifth six-month period is related to the practical application of all issues defined in the first, second, third and fourth project periods with regards to establishment of the Emergency Plans in case of pollution, fire or other accidents (WP 9), developing of posters on safety precautions and information in the marina (WP 9), promotion of a clearly posted map indicating the location of different facilities in the marina (WP 9),prepared on the third publication-brochure in relation to the level of project realization (WP 9) and implementation all documentations for Integrated Management System (ISO 9001:2015 and ISO 14001:2015 standards) of AD Marina Bar (WP 10). The engagements of all members of the SUST-MARINA project team represent the motivation for the further activities and events. For the reported period, practically all deliverables of WP 9 and some deliverables WP 10 were achieved. Therefore, achieved results have been concentrated on the implementation of Marina Emergency Plan (WP 9), implementation of posters on safety precautions and information in the marina (WP 9), integration of marina Environmental Management System with emergency plan in marina (WP 9), implementation all documentations for Integrated Management System (ISO 9001:2015 and ISO 14001:2015 standards) of AD Marina Bar and (QMS (2015) and EMS (2015)) (WP 10) with 15 Procedures and Guide Manual – Handbook (WP 10).

Expected results of the project activities through the fifth six-month period are the received Certificate of the second year pilot programme of Blue Flag, established adequate and clearly signposted lifesaving, first-aid and fire-fighting equipment (WP 9), developed of Emergency Plans in case of pollution (WP 9), fire or other accidents with posters on safety precautions and information in the marina (WP 9), designed and implemented of a clearly posted map indicating the location of different facilities in the marina (WP 9), integrated of marina EMS with emergency plan in marina (WP 9), implemented all documentations for Integrated Management System (ISO 9001:2015 and ISO 14001:2015 standards) of AD Marina Bar and Guide Manual – Handbook (WP 10). The partners in this project have recognized the importance of Improvement of Safety and Services in AD Marina Bar (WP 9) for the continued development of the AD Marina Bar and consider that there is an urgent need for setting Blue Flag programme, certification of ISO 14001:2015 and ISO 9001:2015 and Gold Anchor award in certification requirements to effectively monitor and identify progress towards results achieved in the fifth six-month period of project realization.